A kitchen remodel in Austin goes smoother when the biggest choices are made before anyone swings a hammer: whether the sink, range or walls will move. Those three choices set the permit path with the City of Austin, the plumbing and electrical scope, and how the range hood has to be vented. Settle them on paper first, and demolition becomes the easy part.
Will anything move, or are you replacing in place?
Start here, because almost every other decision follows from it. A “replace in place” kitchen keeps the sink, dishwasher, range and refrigerator where they are and swaps cabinets, counters, backsplash, flooring and appliances. A layout change moves at least one of those, opens or removes a wall, or adds an island with a sink or cooktop.
Walk the room and write down what bothers you about the current kitchen. Examples might be a dishwasher that blocks a corner drawer, a refrigerator door that swings into a walkway, no landing space next to the cooktop, or one person cooking while another is trapped at the sink. Then ask of each item: does fixing it require moving a fixture or a wall, or can better cabinets and storage solve it?
That list is worth more than any inspiration photo. It tells you whether you are planning a finish project or a rebuild of the room.

Does a kitchen remodel need a permit in Austin?
It depends on what changes. The City of Austin’s work exempt from building permits list includes painting, papering, tiling, carpeting, cabinets, countertops and similar finish work. Exempt work still has to meet the building code; it just doesn’t need a building permit.
Once the scope goes past finishes, the City’s Express Permit program covers a kitchen remodel only within tight limits: walls cannot be removed or relocated, and plumbing fixtures cannot be relocated or added. The City notes that a plumbing, electrical or mechanical trade permit may also be required, and those trade permits should be listed on the application so they are issued with the express permit. The City says most express permits are issued in about one business day, though floodplain and historic properties can take longer.
If your plan removes a wall or moves the sink, the project goes through Residential Plan Review as an interior remodel instead. That page also explains that changing an approved design or adding a trade permit after approval requires a revision. That is the practical reason to finish layout decisions before you apply, not halfway through demolition.
How should the range hood be vented?
This decision is easy to leave too late, because the duct route has to be planned while the wall and ceiling are open. Under the City of Austin’s adopted 2024 residential code, Chapter 15, a ducted kitchen hood must discharge outdoors through a smooth, airtight duct with a backdraft damper. It cannot end in the attic or crawl space, and the duct must be galvanized steel, stainless steel or copper. The code’s minimum kitchen exhaust rate is 100 cfm intermittent or 25 cfm continuous. Listed ductless hoods are allowed when installed per the manufacturer’s instructions and the room has other ventilation.
A bigger hood raises a second question. If the hood can exhaust more than 400 cfm and the house has a gas, liquid or solid fuel-burning appliance inside the air barrier that is neither direct-vent nor mechanically drafted, the code requires makeup air at roughly the same rate, through an outdoor air duct and a damper that opens when the hood runs. An all-electric kitchen with no such appliance does not trigger that rule. Check what your water heater and furnace are before you pick the hood, not after.
What about wiring, lighting and outlets?
Decide where every appliance, outlet, light and switch goes while the walls are open. Moving the range, adding an island outlet or putting the microwave in a drawer all change the electrical scope, and new circuits or outlets can bring an electrical trade permit into the project. Under-cabinet lighting, a dedicated circuit for a new appliance, and outlets at an island are far simpler to run before drywall and cabinets go back up than after.
If drywall comes down, the City’s express permit page also points out that smoke and carbon monoxide alarms must meet code requirements. Ask whether yours will need updating as part of the job.
Is your house older than 1978?
If so, plan for lead-safe work before demolition. The U.S. EPA’s Renovation, Repair and Painting rule applies to paid work that disturbs paint in homes built before 1978. Demolition of painted surfaces is always covered, regardless of size; the small-job exemption (6 square feet or less of painted surface per room inside) does not apply to it. Paint testing is not required, but unless there is documentation that the paint is not lead-based, the rule’s work practices apply. Tearing out old painted cabinets and walls in an older Austin home is exactly the kind of job it covers.
When is a kitchen refresh the simpler answer?
If the layout already works, keeping fixtures where they are is the simpler path. New cabinet fronts or boxes, counters, a backsplash, paint and lighting can change how a kitchen feels without moving plumbing or walls. Under the City’s exemption list, cabinets, countertops and tile do not need a building permit, although any electrical or plumbing work that goes with them still has to be handled properly.
A full layout change makes sense when the problems on your list come from where things are, not what they look like. Either way, put the decisions in writing first. Ridgepoint Solutions plans kitchen remodeling the same way every time: a walk-through of the space, a written scope, a written price and a schedule, with any change written down with its price before the work is done. If the remodel reaches outside the walls, such as a new hood vent through the roof or siding, see exterior remodeling, and for related ventilation choices in a bath, see our post on bathroom exhaust fans.
We work with homeowners in Austin and surrounding Central Texas communities. Get a free estimate or email info@ridgepoint-solutions.com, and we will walk the kitchen with you before anything comes out.
Frequently asked questions
Do I need a permit to replace kitchen cabinets and countertops in Austin?
Not a building permit, according to the City of Austin’s list of work exempt from building permits, which includes cabinets, countertops, tiling and similar finish work. The work still has to meet code. If the project also moves plumbing, adds circuits or outlets, or changes ventilation, the exemption no longer covers the whole job, and a remodel or trade permit may be needed. Confirm your scope with the City before you start.
Can I move my kitchen sink under an Austin express permit?
No. The City of Austin’s Express Permit qualifications for a kitchen remodel say plumbing fixtures cannot be relocated or added and walls cannot be removed or relocated. Moving the sink, adding an island sink or taking out a wall takes the project outside express permitting and into a regular residential permit application through Residential Plan Review, with any plumbing or electrical trade permits the work needs.
Does a powerful range hood need makeup air?
Under the 2024 residential code the City of Austin has adopted, makeup air is required when a hood can exhaust more than 400 cfm and the home has a fuel-burning appliance inside the air barrier that is neither direct-vent nor mechanically drafted, such as a gas water heater that vents by natural draft. The makeup air must roughly match the exhaust rate and use an outdoor duct with a damper. An all-electric home does not trigger the requirement.