Ridgepoint Solutions

Remodeling · Ridgepoint Solutions

Bathroom remodeling in Austin, TX

Bathrooms handle water every day, so what is behind the tile matters as much as the finish. We walk the room with you, check for existing water damage, and write the scope, price and schedule before work starts.

Modern bathroom with a wood-top vanity, matte black faucet and glass shower

What a bathroom remodel can include

  • Showers and tub-to-shower conversions: new shower base or pan, waterproofing behind the tile, glass enclosure.
  • Tubs: replacement or removal.
  • Tile: floors, shower walls and backsplash.
  • Vanities, sinks and toilets: replaced and connected.
  • Ventilation and lighting: exhaust fans that vent outside the house, and better lighting.
  • Accessibility updates: low-curb showers, grab bars and wider clearances where the room allows.

Water damage first

If we find rot or water damage when the old finishes come out, we show you, then write and price the repair before going further.

How a bath remodel is planned

  1. 1Walk-through and a check for existing water damage.
  2. 2Scope: a written list of the work and materials.
  3. 3Price: a written price tied to that scope.
  4. 4Schedule: including which bathroom you can use meanwhile.
  5. 5Build and a final walk-through.

Changes after the scope is signed

Changes happen. Each change gets written down with its price before the work is done, so the final bill has no surprises.

Paying over time

Financing options are available through lending partners. Financing is subject to credit approval and approval is not guaranteed. See financing options ›

Questions people ask

How long is the bathroom out of use?

The schedule spells it out before we start.

Can you convert a tub to a shower?

Yes. It is one of the most common bathroom projects.

What if you find damage behind the walls?

We stop, show you, and price the repair in writing first.

Do I get a written price?

Yes, before work starts.

More remodeling services

Where we work

We serve Austin and ten surrounding Central Texas cities, including Austin, Round Rock, Georgetown. Each city page has that city's permit rules and weather records. See all 11 service areas ›

Photos and write-ups of our work will appear on the projects page.

Our promise

Ridgepoint Workmanship Guarantee

A 10-year workmanship warranty on full roof replacements, and up to 1 year on repairs.

  • 10-year workmanship warranty on full roof replacements.
  • Up to 1 year of workmanship coverage on repairs.
  • This warranty covers our workmanship. Manufacturer or material warranties are separate and not part of it.
Read the guarantee terms ›

Get your free estimate

Free inspection and written estimate. Use the form, or call (737) 418-8832.

Request my estimate

Project planning

Plan a bathroom from the wet areas outward

Set the water-management details first

Shower shape, drain location, substrate and waterproofing need to work together before tile is installed. Review how transitions, niches and penetrations will be handled in the scope. Tile and grout are finish materials, not a substitute for a properly planned water-management assembly behind them.

Balance everyday use and access

Discuss storage, lighting, ventilation and practical clearances along with appearance. If the home has only one usable bathroom, temporary arrangements and work sequencing need early attention. Confirm fixtures and dimensions before ordering so a finish change does not create an unexpected plumbing or layout revision.

Finished bathroom with tiled shower and glass enclosure
Stock photo for planning reference; not a Ridgepoint project.
Close view of joint-compound finishing on an interior wall
Stock photo for planning reference; not a Ridgepoint project.
(737) 418-8832 Consultation