When several rooms change at once, the order of work matters. Planning everything on one scope and one schedule avoids doing work twice: walls, plumbing and electrical go first; flooring, paint and trim go last.

Open-plan living area and kitchen with handleless cabinets

What a whole home remodel can include

  • Floor-plan changes: opening or moving walls and reworking how rooms are used.
  • Kitchen and bathrooms together on one schedule.
  • Flooring throughout, for consistent transitions between rooms.
  • Walls, ceilings, trim and doors.
  • Lighting, plumbing and electrical updates tied to the new layout.
  • Interior painting as the final layer.

One plan, phased work

We break the project into phases so you know which areas are closed and when. If you stay in the home, we plan living space, dust control and access for each phase.

How a whole home remodel is planned

  1. 1Walk-through of the whole house.
  2. 2Scope: written by room and by phase.
  3. 3Price: a written price tied to that scope.
  4. 4Schedule: a phased schedule with milestones.
  5. 5Build and a final walk-through.

Changes after the scope is signed

Changes happen. Each change gets written down with its price before the work is done, so the final bill has no surprises.

Paying over time

Financing options are available through lending partners. Financing is subject to credit approval and approval is not guaranteed. See financing options ›

Questions people ask

Can we live in the house during the work?

Sometimes, depending on the phases. We plan it with you.

Can we do it in stages?

Yes. Phases can be scheduled over time.

Do you handle permits?

Where the work needs permits, they are part of the scope.

Do I get a written price?

Yes, before work starts.

More remodeling services

Where we work

We serve Austin and ten surrounding Central Texas cities, including Austin, Round Rock, Georgetown. Each city page has that city's permit rules and weather records. See all 11 service areas ›

Photos and write-ups of our work will appear on the projects page.

Our promise

Ridgepoint Workmanship Guarantee

A 10-year workmanship warranty on full roof replacements, and up to 1 year on repairs.

  • 10-year workmanship warranty on full roof replacements.
  • Up to 1 year of workmanship coverage on repairs.
  • This warranty covers our workmanship. Manufacturer or material warranties are separate and not part of it.
Read the guarantee terms ›

Get your free estimate

Free inspection and written estimate. Use the form, or call (737) 418-8832.

Request my estimate

Project planning

Make phasing part of the design

Group decisions that affect multiple rooms

Flooring transitions, door styles, lighting and utility changes often connect spaces that initially seem independent. Establish shared selections and the order of work before individual room choices become fixed. A coordinated plan helps avoid opening a completed area again to reach work that should have happened earlier.

Plan living arrangements realistically

Discuss whether the home can remain occupied during each phase and which essential rooms must stay available. Material readiness, inspection requirements and hidden conditions can affect sequencing. Keep a written record of allowances, selections and approved changes so the overall scope remains understandable as several rooms move through different stages.

Bright kitchen with light cabinetry and continuous worktops
Stock photo for planning reference; not a Ridgepoint project.
Close view of joint-compound finishing on an interior wall
Stock photo for planning reference; not a Ridgepoint project.
(737) 418-8832 Consultation